FAA - WVI LOC and DME
Watsonville, CA.
This project was not without it’s complications. This was one of the wettest January and February for northern and central California in modern history. Floods and ground saturation delayed construction. Once the weather and soil conditions improved we were able to get started. Per the FAA design, NASCO created a new site for a new shelter to house the Localizer and high powered DME. We brought in new utility lines from off airport commercial services. Additionally, we built a new duct bank from the new shelter to existing Localizer antenna array. As always we enjoyed working with the FAA and airport personnel to complete this amazing new site.
- Demolished existing infrastructure.
- Built 1000ft road to new shelter.
- Built new shelter and parking pad.
- Built new DME antenna pole and foundation.
- Built 700lf of new duct bank to Localizer Array.
- Built 250lf of new utility duct bank for power and telco.
- Installed and tested new EES per FAA specifications.
FAA - PNS ASOS
Pensacola, FL.
Moving this ASOS took a fair amount of coordination to minimize the down time as the weather forecasts were not looking good. We lucked out and the weather was beautiful. As always we enjoyed working with the FAA and airport personnel to complete this amazing looking new site.
- Created new layout for the ASOS sensor foundation.
- Poured new foundation piers and pads.
- Installed new Earth Electrode System (EES).
- Built new power rack.
- Installed new power duct to facility transclosure.
- Relocated sensors to new site and connected sensors to DPU.
- Tested new EES per FAA specifications.




FAA - PIH VOR/DME
Pocatello, ID.
This was a fun project for us. We enjoyed working with the FAA to help build a beautiful facility.
- Disassembled Panels
- Removed and disposed of old hardware.
- Removed old calk, glue, and gaskets.
- Sanded old paint, and prepared surface for paint.
- Applied new coat of two part epoxy paint.
- Assembled Radome using new hardware.
- Hoisted and secured into place on new structure.
FAA - BOI VORTAC
Boise, ID.
This was a challenging but rewarding project. The daytime temperatures exceeded 100 deg. F. each day. Due to supply chain shortage we struggled to get concrete delivered. In the end we provided another beautiful product.
- Demolished non compliant antenna tower.
- Installed new Duct-Bank.
- Formed, assembled, and poured new concrete foundation.
- Assembled new antenna tower and rack.




FAA - CRG LOC
Jacksonville, FL.
This was a fantastic project. The weather couldn’t have been any better. And to top it off, the FAA personnel were very professional and supportive.
- Removed MK1F LOC from old shelter.
- Removed and disposed of old shelter and foundation.
- Poured new foundation piers.
- Installed new power distribution rack.
- Set new building and connected new electrical service.
- Installed MK1F LOC in new shelter.